BSE was the Prime consultant as well as providing Electrical engineering for the 167 kW-DC photovoltaic (PV) system with a 208V utility interconnection. The project installed 630 photovoltaic modules, six (6) 24kW inverters, and electrical wiring and connections to the existing building main electrical service switchboard.
Location: San Diego, CA
Year: 2015
Services: Prime Consultant, Electrical Engineering
Owner: Port of San Diego