Electrical engineering for the expansion and reconfiguration of the 12kV electrical distribution system at the San Diego International Airport (SDIA). The project created four (4) 12kV loops connected to the 3-source main service switchgear. The expansion provided a redundant primary electrical distribution system and eliminated 19 utility electric meters. The project powered the new Rental Car Center and allowed for future large-scale self-generation.
Location: San Diego, CA
Year: 2015
Services: Electrical Engineering
Owner: San Diego County Regional Airport Authority